Welcome the proceedings of Chambéry 2026 congress website

This site uses cookies to optimize its operation. They allow you to securely access your personal space and download our publications. You accept their use by clicking on the "Accept" button.

17TH World Congress on Road Winter Service, Resilience and Decarbonisation - Pre-proceedings of the Congress

Unavailable download

To download documents from the Pre-Proceedings website, you must be registered for the conference and logged in to the conference platform.

Connect
  • IP0246 - Renovation of the Autreville viaduct in Meurthe-et-Moselle (FRANCE)
    Catherine MOTSCH , Benjamin COLLIN , Guillaume ARTIS , Rémi VELLUET

    Autreville viaduct, built in 1971, supports the A31 motorway between Nancy and Metz, is 232m long and 32m wide. Its twin-beam metal structure with orthotropic slab crosses the Moselle and supports traffic of 65,000 vehicles per day, including 15% heavy goods vehicles. Since 2016, due to the appearance of numerous worrying cracks and premature fatigue of the structure, it has been placed under strengthened [...]