Unavailable download
To download documents from the Pre-Proceedings website, you must be registered for the conference and logged in to the conference platform.
Connect-
IP0047 - Strengthening the Resilience of Hydraulic Structures on the Road Network of the DIR Massif Central (FRANCE): Methodology and Work.
The cutting of the A75 (motorway linking Clermont-Ferrand to Montpellier and Béziers) in September 2015 south of the commune of Lodève (FRANCE) was caused by the sudden rupture of an highway's embankment at the level of a metal culvert for hydraulic restoration. This mess was caused by a localized and intense Mediterranean rainy event (cumulations estimated around 300 mm in 3 hours). This major [...]